If the cost of electricity decreased to 8 ¢/kWh, which alternative would be the most cost-effective?

Case Study Exercises

  1. If the cost of electricity decreased to 8 ¢/kWh, which alternative would be the most cost-effective?
  2. At what electricity cost would the following alternatives just break even? (a) Alternatives 1 and 2, (b) alternatives 1 and 3, (c) alternatives 1 and 4.

Background

Aeration and sludge recirculation have been practiced for many years at municipal and industrial water treatment plants. Aeration is used primarily for the physical removal of gases or volatile compounds, while sludge recirculation can be beneficial for turbidity removal and hardness reduction.

When the advantages of aeration and sludge recirculation in water treatment were first recognized, energy costs were so low that such considerations were seldom of concern in treatment plant design and operation. With the huge increases in electricity cost that have occurred in some localities, however, it became necessary to review the cost-effectiveness of all water treatment processes that consume significant amounts of energy. This study was conducted at a municipal water treatment plant for evaluating the cost-effectiveness of the pre-aeration and sludge recirculation practices.

Information

This study was conducted at a 106 m3/min water treatment plant where, under normal operating circumstances, sludge from the secondary clarifiers is returned to the aerator and subsequently removed in the primary clarifiers. The Figure below (Figure 13–12) is a schematic of the process.

The Topic is: Water Treatment Plant Process costs. The attached file has all the information. There are 7 case study questions but ONLY questions 6 and 7 (HIGHLIGHTED) need to be answered. 1

To evaluate the effect of sludge recirculation, the sludge pump was turned off, but aeration was continued. Next, the sludge pump was turned back on, and aeration was discontinued. Finally, both processes were discontinued. Results obtained during the test periods were averaged and compared to the values obtained when both processes were operational.

The results obtained from the four operating modes showed that the hardness decreased by 4.7% when both processes were in operation (i.e., sludge recirculation and aeration). When only sludge was recirculated, the reduction was 3.8%. There was no reduction due to aeration only, or when there was neither aeration nor recirculation. For turbidity, the reduction was 28% when both recirculation and aeration were used. The reduction was 18% when neither aeration nor recirculation was used. The reduction was also 18% when aeration alone was used, which means that aeration alone was of no benefit for turbidity reduction. With sludge recirculation alone, the turbidity reduction was only 6%, meaning that sludge recirculation alone actually resulted in an increase in turbidity—the difference between 18% and 6%.

Since aeration and sludge recirculation did cause readily identifiable effects on treated water quality (some good and others bad), the cost-effectiveness of each process for turbidity and hardness reduction was investigated. The calculations are based on the following data:

  • Aerator motor = 40 hp
  • Aerator motor efficiency = 90%
  • Sludge recirculation motor = 5 hp
  • Recirculation pump efficiency = 90%
  • Electricity cost = 9 ¢/kWh (previous analysis)
  • Lime cost = 7.9 ¢/kg
  • Lime required = 0.62 mg/L per mg/L hardness
  • Coagulant cost = 16.5 ¢/kg
  • Days/month = 30.5

As a first step, the costs associated with aeration and sludge recirculation were calculated. In each case, costs are independent of flow rate.

Aeration cost:

40 hp × 0.75 kW/hp × 0.09 $/kWh × 24 h/day ÷ 0.90 = $72 per day or $2196 per month

Sludge recirculation cost:

5 hp × 0.75 kW/hp × 0.09 $/kWh × 24 h/day ÷ 0.90 = $9 per day or $275 per month

The estimates appear in columns 1 and 2 of the cost summary in Table 13–1 below.

The Topic is: Water Treatment Plant Process costs. The attached file has all the information. There are 7 case study questions but ONLY questions 6 and 7 (HIGHLIGHTED) need to be answered. 2

Costs associated with turbidity and hardness removal are a function of the chemical dosage required and the water flow rate. The calculations below are based on a design flow of 53 m3/min.

As stated earlier, there was less turbidity reduction through the primary clarifier without aeration than there was with it (28% vs. 6%). The extra turbidity reaching the flocculators could require further additions of the coagulating chemical. If it is assumed that, as a worst case, these chemical additions would be proportional to the extra turbidity, then 22% more coagulant would be required. Since the average dosage before discontinuation of aeration was 10 mg/L, the incremental chemical cost incurred because of the increased turbidity in the clarifier effluent would be

(10 × 0.22) mg/L × 10–6 kg/mg × 53 m3/min

× 1000 L/m3 × 0.165 $/kg × 60 min/h

× 24 h/day = $27.70/day or $845/month

Similar calculations for the other operating conditions (i.e., aeration only, and neither aeration nor sludge recirculation) reveal that the additional cost for turbidity removal would be $469 per month in each case, as shown in column 5 of Table 13–1 above.

Changes in hardness affect chemical costs by virtue of the direct effect on the amount of lime required for water softening. With aeration and sludge recirculation, the average hardness reduction was 12.1 mg/L (i.e., 258 mg/L × 4.7%). However, with sludge recirculation only, the reduction was 9.8 mg/L, resulting in a difference of 2.3 mg/L attributed to aeration. The extra cost of lime incurred because of the discontinuation of aeration, therefore, was

2.3 mg/L × 0.62 mg/L lime × 10−6 kg/mg

× 53m3/min × 1000 L/m3 × 0.079 $/kg

× 60 min/h × 24 h/day = $8.60/day or

$262/month

When sludge recirculation was discontinued, there was no hardness reduction through the clarifier, so that the extra lime cost would be $1380 per month.

The total savings and total costs associated with changes in plant operating conditions are tabulated in columns 3 and 6 of Table 13–1 above, respectively, with the net savings shown in column 7. Obviously, the optimum condition is represented by “sludge recirculation only.” This condition would result in a net savings of $1089 per month, compared to a net savings of $622 per month when both processes are discontinued and a net cost of $1574 per month for aeration only. Since the calculations made here represent worst-case conditions, the actual savings that resulted from modifying the plant operating procedures were greater than those indicated.

In summary, the commonly applied water treatment practices of sludge recirculation and aeration can significantly affect the removal of some compounds in the primary clarifier. However, increasing energy and chemical costs warrant continued investigations on a case-by-case basis of the cost-effectiveness of such practices

GET THE COMPLETED ASSIGNMENT

ASSIGNMENT COMPLETED AT CapitalEssayWriting.com

MAKE YOUR ORDER AND GET THE COMPLETED ORDER

CLICK HERE TO ORDER THIS PAPER AT CapitalEssayWriting.com ON 

  • If the cost of electricity decreased to 8 ¢/kWh, which alternative would be the most cost-effective?
  • NO PLAGIARISM, Get impressive Grades in Your Academic Work

    Categories
    Writers Solution

    The net income of Steinbach & Sons, a landscaping company, decreased sharply during 2018.

    The net income of Steinbach & Sons, a landscaping company, decreased sharply during 2018. MortSteinbach, owner and manager of the company, anticipates the need for a bank loan in 2019. Late in2018, Steinbach instructs the company’s accountant to record $2,000 service revenue for landscapeservices for the Steinbach family, even though the services will not be performed until January 2019.Steinbach also tells the accountant not to make the following December 31, 2018, adjusting entries:Salaries owed to employees $ 900Prepaid insurance that has expired 400Requirements1. Compute the overall effects of these transactions on the company’s reported net income for2018.2. Why is Steinbach taking this action? Is his action ethical? Give your reason, identifying theparties helped and the parties harmed by Steinbach’s action.3. As a personal friend, what advice would you give the accountant?

    GET SOLUTION BELOW

    CLICK HERE TO MAKE YOUR ORDER

    TO BE RE-WRITTEN FROM THE SCRATCH

    NO PLAGIARISM

    • Original and non-plagiarized custom papers. Our writers develop their writing from scratch unless you request them to rewrite, edit or proofread your paper.
    • Timely Delivery. capitalessaywriting.com believes in beating the deadlines that our customers have imposed because we understand how important it is.
    • Customer satisfaction. Customer satisfaction. We have an outstanding customer care team that is always ready and willing to listen to you, collect your instructions and make sure that your custom writing needs are satisfied
    • Privacy and safety. It’s secure to place an order at capitalessaywriting.com We won’t reveal your private information to anyone else.
    • Writing services provided by experts. Looking for expert essay writers, thesis and dissertation writers, personal statement writers, or writers to provide any other kind of custom writing service?
    • Enjoy our bonus services. You can make a free inquiry before placing and your order and paying this way, you know just how much you will pay. A verdict was rendered against three parent chaperones. How was the third parent included in the case?
    • Premium papers. We provide the highest quality papers in the writing industry. Our company only employs specialized professional writers who take pride in satisfying the needs of our huge client base by offering them premium writing services The net income of Steinbach & Sons, a landscaping company, decreased sharply during 2018.

    Get Professionally Written Papers From The Writing Experts 

    Green Order Now Button PNG Image | Transparent PNG Free Download on SeekPNG Our Zero Plagiarism Policy | New Essays
    Categories
    Writers Solution

    Economic crisis in the state of Arizona, home values decreased dramatically and homeowners began walking away from their homes in large numbers

    During the most recent economic crisis in the state of Arizona, home values decreased dramatically and homeowners began walking away from their homes in large numbers.  This was largely due to the fact that they owned more on the home than it was worth and in many cases they could no longer afford to make the payments.  Financial institutions foreclosed on large numbers of homes and forced the owners to leave.  As they left their real property homeowners ofter stripped the home of anything valuable they could remove.  Homeowners took appliances, window coverings, light fixtures, ceiling fans, water heaters, rugs and carpets,plumbing fixtures (toilets, sinks, showers, bathtubs etc.) electrical wiring, doors, cabinets and sometimes even windows and outdoor plants from property they no longer owned.

    Given the understanding that many of these things qualify as “fixtures” that are attached and should remain with real property (the home), discuss in an original post whether or not you think their decision to remove these items is ethical (or even legal?)  How do you think some of these people justified taking these items?  Do you agree or disagree with that reasoning?  Should the financial institutions have pursued legal action against these people?

    Write an original 200+ word post. Always discuss any ethical issues that are involved. Cite any other sources you use when writing your post

    Assignment statusSolved by our Writing Team at CapitalEssayWriting.com