The council for the town of Scone (Upper Hunter Shire Council) has engaged the consultancy engineering company you are employed at (UoN Engineering

ENGG2500 Sustainable Engineering Practice
Energy Systems Project
1 Introduction
The council for the town of Scone (Upper Hunter Shire Council) has engaged the consultancy engineering company you are employed at (UoN Engineering) to identify the optimal energy mix to power consumer loads within their region. Your engineering team is required to write a technical report that addresses three main points:

  1. Identify energy sources in the region that can be exploited to meet the energy requirements of consumer loads;
  2. Select the energy sources, and energy storage technologies, which optimise the system;
  3. In determining the optimality of your solution, consider and quantify (to the best extent possible) the environmental, cultural, nancial and ethical impacts of your design.
    2 Background Information
    The following background information will help in nding the optimal energy mix for the town.
    The council has speci ed that the energy mix can be made up of the following energy sources/storage technologies:
    Fossil fuel red generators
    Solar PV or thermal solar
    Wind turbines
    Hydro turbines
    Electrochemical storage
    Pumped hydro storage
    The council has only recently been elected and has asked you to keep in mind that they promised during the previous election campaign that at least 50% of electric power would be generated from renewable sources in the newly designed power grid.
    The residents who own and farm land in and around Scone, and who are often a powerful political force in Upper Hunter Shire Council elections, are often highly aware of and concerned with any environmental impacts a ecting the region.
    The tax payers of Scone generally expect council infrastructure projects to provide a high quality service at a low nancial cost.
    The citizens of Scone typically have high expectations for the reliability of the energy supplied to their places of business and their households. Power outages will result in:
    Consumer inconvenience;
    Lost economic output;
    Increasing political pressure on the council.
    There exists a grid connection, over which large amounts of energy can be exchanged, between Scone and Muswellbrook. The nancial cost of importing energy from Muswellbrook, and the sale price for exporting energy to Muswellbrook, is determined in real time by the Australian Energy Market Operator (AEMO). If your design utilises this grid connection, past energy price charts are available online from AEMO for you to consider in your design. Assume the grid connection has an energy mix of 80% coal red power station, 10% hydro-electric power and 10% solar PV.
    The overall electricity consumption (44GWh per year) is assumed split into four elements, each with their own load pro le and social/political/economic penalties associated with outages.
    Residential (40%)
    Industrial (30%)
    Non-critical commercial (20%)
    Critical commercial (10%)
    Any available sites in the region in which a hydroelectric dam / pumped hydro storage could be located happen to be situated on indigenous land.
    3 Requirements
    3.1 Design
    When designing a solution, the following issues should be at least considered in your report:
    The nancial cost of your solution, including purchasing costs, maintenance costs and salvage costs/pro ts.
    The reliability of your solution i.e. is there any unmet load at any time during the year, if so how much and which loads does it a ect?
    The environmental cost of your solution, including the impact on climate change.
    The amount of land required for your solution.
    The appropriateness of your solution to the social, political and cultural environment in the town of Scone.
    The simulation package Homer Pro can be utilised to investigate the following:
    The instantaneous match / mismatch between load and generation in the system on a hour-to-hour basis;
    A nancial cost comparison of alternate energy mixes;
    Total carbon dioxide, unburnt hydrocarbons, sulfur dioxide outputs … of alternate energy mixes.
    3.2 Report length
    The report should be no longer than 20 pages long and have no more than 5,000 words.
    3.3 Submission
    Only one report is to be submitted per group. There is a brief oral presentation with your tutors before you submit. The oral presentation is simply to explain in what each group member has contributed/will contribute to the project and their understanding of their contribution. This will be done in week 13 tutorial session time. Due to the covid restrictions, this will be done in breakout rooms through Zoom.
    It should be a ‘proper’ engineering report just as in Assignment 2. I need you to have these features:
    Title page which includes the authors names, student numbers, and date.
    The percentage contribution of the authors to the report and the parts of the report that they have contributed to, should be included on the title page.
    An executive summary/abstract this should be only a couple of paragraphs ideally and certainly no longer than 1 page. The executive summary should be a concise summary of what you have done and why.
    An introduction which sets the framework/context of the work.
    Some sections which contain your work. These will display your results and importantly your analysis of these results.
    A conclusion
    A bibliography
    Appendices as required for Matlab code etc.
    You must cite references for all things that are not widely known. You don’t need to cite F = ma but you should cite the source of something like solar irradiance data or load patterns. I don’t mind which referencing scheme you use but you must be consistent.
    You must use relative referencing. I.e. don’t say ‘the table below’. Say instead Table 1.
    Column A Column B Column C
    1 2 3
    4 5 6
    Table 1: Table of Numbers
    4 Modelling
    The Homer Pro software contains built in models that predict the amount of energy output from solar PV and hydro turbines based on relevant resource input data. However, the council has provided encouragement for UoN engineering to deliver a working custom model for an energy source used in the energy mix. The custom model should be written in Matlab, and interface with Homer Pro. This is not a strict requirement of the project but would be highly regarded.
    5 Helpful Tips
  4. By modifying when energy sources and storage technologies are producing / storing energy, with respect to the price of electricity, irradiance and wind speed at that time etc, an optimal dispatch strategy can be formulated. The nancial and environmental cost can often be signi cantly improved if the dispatch strategy of the energy mix is considered. Homer Pro facilitates xed and customisable dispatch strategies.
  5. Many of the criteria for the project are not able to be assessed by Homer Pro. Some of these include:
    (a) Cultural e ects.
    (b) Visual pollution.
    (c) Construction e ects.
    (d) The environmental e ects of manufacture and disposal of components.
    (e) Repatriation of the land at the end of project lifetime end.
    These criteria should be considered using the other tools that you have been exposed to during the course. These obviously include life cycle analysis (LCA) and multicriteria decision analysis.
  6. Assume that the project lifetime is 50 years. Given that, you will need to make sensible assumptions regarding replacement costs. For example it’s predicted that the cost of battery storage will reduce by about 60% over the next 10 years with similar falls in solar PV. So if you assume that the replacement costs will be xed that could well get a poor estimate of the costs generation.
    Of course predictions are error prone. It’s always good to provide some level of con dence normally via references. Sensitivity analysis should be considered.
  7. The page and word limits are maxima. Good report writing is concise. You will be rewarded for well written concise reports. You will be penalised for poorly written verbose reports.
    6 Marking Rubric
    The marking rubric is shown in Tables 2 and 3

GET SOLUTION BELOW

CLICK HERE TO MAKE YOUR ORDER

TO BE RE-WRITTEN FROM THE SCRATCH

NO PLAGIARISM

  • Original and non-plagiarized custom papers. Our writers develop their writing from scratch unless you request them to rewrite, edit or proofread your paper.
  • Timely Delivery. capitalessaywriting.com believes in beating the deadlines that our customers have imposed because we understand how important it is.
  • Customer satisfaction. Customer satisfaction. We have an outstanding customer care team that is always ready and willing to listen to you, collect your instructions and make sure that your custom writing needs are satisfied
  • Privacy and safety. It’s secure to place an order at capitalessaywriting.com We won’t reveal your private information to anyone else.
  • Writing services provided by experts. Looking for expert essay writers, thesis and dissertation writers, personal statement writers, or writers to provide any other kind of custom writing service?
  • Enjoy our bonus services. You can make a free inquiry before placing and your order and paying this way, you know just how much you will pay. A verdict was rendered against three parent chaperones. How was the third parent included in the case?
  • Premium papers. We provide the highest quality papers in the writing industry. Our company only employs specialized professional writers who take pride in satisfying the needs of our huge client base by offering them premium writing services The council for the town of Scone (Upper Hunter Shire Council) has engaged the consultancy engineering company you are employed at (UoN Engineering

Get Professionally Written Papers From The Writing Experts 

Green Order Now Button PNG Image | Transparent PNG Free Download on SeekPNG Our Zero Plagiarism Policy | New Essays

By admin

Academic tutoring services from the best essay writing company

Leave a Reply

Your email address will not be published. Required fields are marked *